Today, we had our Fibre Project Manager – Daniel Wright, undertake a manhole inspection for the cable landing preparation works in Perth.
Surveys are crucial to ensure the proposed route is clear of obstructions and ensures the infrastructure has the capacity to handle the new cables. Inspections are done well before the cable arrives to avoid delays to the marine installation segment which might put the programme at risk. By the time the cable ship arrives, all landing infrastructure including Beach Man Holes, Ducts and Cable Landing Station should be in place through which to haul the new cable.
