After a successful HDD completion, the team is now dismantling the rig in preparation for the Beach Manhole excavation works. Over the past week, we completed the final steps to conclude the HDD. These included verifying the offshore HDD exit with divers, testing and installing the messenger rope, which will ultimately be used to draw in the optic fibre cable from the ocean when the cable ship arrives mid-next year. Additionally, the team fitted the necessary hardware to the conduits and conducted a site cleanup to ensure a smooth transition into the Beach Manhole construction.