South Australia has officially marked the beginning of its first-ever subsea cable, with the arrival of the world’s largest-capacity cable laying vessel, Ile d’Yeu, in Port Adelaide.
Premier Peter Malinauskas joined SUBCO Founder and CEO Bevan Slattery to welcome the vessel, which will begin construction on the $400 million, 5,000 km SMAP system.
Premier Malinauskas described the project as a “landmark moment for South Australia”, highlighting the transformative potential for data-intensive industries such as defence, energy, space, and manufacturing.
Slattery emphasised that the Adelaide landing represents the next step following Perth’s successful connection in July and noted the historic nature of SMAP as the first hyper cable of its kind on Australian shores.
The Ile d’Yeu, operated by Alcatel Submarine Networks, is a 147-metre vessel purpose-built for long-haul deployments. Equipped with a 35-tonne seabed plough and more than 8,500 tonnes of cable-loading capacity, it will lay the infrastructure that underpins Australia’s digital future.
With construction now underway in Adelaide, South Australia is set to be directly connected to the global digital ecosystem for the first time – a development poised to drive economic growth, innovation, and jobs well into the future.