SMAP’s Torquay West branching unit (X-BU) has successfully made it into the water, marking another step closer to RFS for Australia’s first hypercable.
The successful install connects Torquay with Adelaide and represents months of planning, coordination, and precision engineering, ensuring the cable is perfectly positioned for its next stage of deployment. The X-BU is a next-generation branching unit that integrates electrical and optical switching into a single wet body for high-fibre systems like SMAP. This reduces deployment complexity and simplifies operations and maintenance. Electrical switching supports flexible powering and fault isolation, while optical switching enables fibre pairs to be selectively added, dropped, or bypassed at the branch.
The final branching unit – Torquay East – connecting Melbourne (Torquay) and Sydney is next, with the final splice to follow.
Stay tuned for further updates.