Watch: Maroubra HDD timelapse – Installation of the beach manholes and reinstatement

SUBCO has reached a major milestone in the SMAP subsea cable project, completing horizontal directional drilling (HDD) at Broadarrow Reserve in Maroubra. The time-lapse video captures weeks of engineering precision, community collaboration, and logistical coordination — condensed into 30secs.

This stage of the project involved:

  • Six successful horizontal directional drills, enabling safe and environmentally conscious cable landings.
  • Installation of three massive beach manholes (each over 24 tonnes), to house and protect the ocean lead-ins.
  • Underwater positioning checks by divers, ensuring accuracy and stability of seabed infrastructure.|
  • Cultural heritage oversight, led by the La Perouse Local Aboriginal Land Council, and support from Randwick City Council and NSW Crown Lands.

This work, delivered in partnership with UEA Pty Ltd sets the foundation for SMAP’s high-capacity connectivity across Australia.

Stay tuned as we move from land to sea, connecting Sydney to Melbourne, Adelaide and Perth!