VicTrack backhaul hits 92% – Melbourne–Geelong rail corridor takes shape

The terrestrial backhaul connecting SMAP’s Melbourne (Torquay) landing to our PoPs is moving fast. We’re now at 92% completion – and the progress made over the couple of months reflects a serious team effort across design, permitting, procurement, and civil works.

20260315 211541

The cross-functional team has delivered across every front simultaneously:

  • Final designs locked in – confirming the exact cable routing and specifications through the VicTrack rail corridor between Melbourne and Geelong.
  • Complex permits secured – working within an active rail corridor means navigating a demanding approvals environment. Those permits are now in hand.
  • 47km of cable installed – that’s over 50% of the full cable route, laid within the rail corridor, with civil and installation works progressing at pace.
  • Interconnection links completed – the segments linking the rail corridor to our PoPs in both Torquay and Melbourne are already in the ground and done.
20260326 090612
20260302 115623

Routing backhaul through the VicTrack rail corridor delivers a geographically diverse, protected route that avoids the congestion and risk exposure of existing road-based conduit networks. For a system like SMAP, where route diversity and resilience are design principles, not afterthoughts, this matters.

With over 92% complete and the interconnection links already done, the focus shifts to finishing the remaining cable installation and progressing toward end-to-end testing and full network integration.

Image (76)