The terrestrial backhaul connecting SMAP’s Melbourne (Torquay) landing to our PoPs is moving fast. We’re now at 92% completion – and the progress made over the couple of months reflects a serious team effort across design, permitting, procurement, and civil works.
The cross-functional team has delivered across every front simultaneously:
- Final designs locked in – confirming the exact cable routing and specifications through the VicTrack rail corridor between Melbourne and Geelong.
- Complex permits secured – working within an active rail corridor means navigating a demanding approvals environment. Those permits are now in hand.
- 47km of cable installed – that’s over 50% of the full cable route, laid within the rail corridor, with civil and installation works progressing at pace.
- Interconnection links completed – the segments linking the rail corridor to our PoPs in both Torquay and Melbourne are already in the ground and done.
Routing backhaul through the VicTrack rail corridor delivers a geographically diverse, protected route that avoids the congestion and risk exposure of existing road-based conduit networks. For a system like SMAP, where route diversity and resilience are design principles, not afterthoughts, this matters.
With over 92% complete and the interconnection links already done, the focus shifts to finishing the remaining cable installation and progressing toward end-to-end testing and full network integration.