The Torquay Cable Landing Station (CLS) is one of two CLS projects that SUBCO is developing from the ground up as greenfield sites. SUBCO has signed a contract of sale for land which is now unconditional following due diligence, which included:
- A review of any planning controls which constrain how the site may be used and developed
- Detailed costing associated with site development
- Access to the location for the required fronthaul and backhaul conduit runs
- Access to services such as power supply.
The due diligence review highlighted a few approval steps to undertake for planning, but crucially highlighted little new Powercor infrastructure required to power the facility beyond a new ‘drop wire’ from the outside pole to a new pad-mount transformer on the property. The Team will now move to finalise the facility layout and external design before locking in contracts for the building construction.
In parallel, the Team has been finalising the design and route of the conduit requirements from the Beach to the new facility on the assumption that the site will proceed. The final fronthaul construction contracts will now be drawn up to begin the complex approval process in Victoria.