Welcome to the SMAP Blog, the new submarine telecommunications cable between Sydney, Melbourne, Adelaide and Perth. SMAP represents the start of a new generation of hyperscale network infrastructure that will prove critical to Australia’s digital future. With 12 fibre pairs and the use of Spatial Division Multiplexing (SDM) technology, the cable will have substantially increased capacity and reduced energy consumption requirements. As such, the cable is expected to deliver over 300Tbps per section at an extraordinary 15Tb/KW, which would render SMAP 25 times more energy efficient than the legacy terrestrial inter-capital systems that currently exist along the same route.

SUBCO’s Founder and CEO Bevan Slattery said, “I am incredibly excited to start construction on our SMAP cable which is both the jewel and critical foundation piece of our broader vision for a hyperconnected Australia. SMAP is well-positioned to achieve a series of firsts: Australia’s first long-haul submarine cable to utilise SDM technology; the first fully armoured long-haul cable system in Australia; and the first zero carbon long-haul cable system in the world. Once built and operational, SMAP will be the most advanced, secure and innovative submarine cable ever built in Australia.”

The purpose of this blog is to track the progress of the SMAP submarine cable as it is surveyed, installed and delivered. Wherever possible we will provide documents, photographs and possibly video clips of various parts of the project. We plan to be as honest and as open as we can during the project and we will keep you updated with the highs and lows of the project.