Ever wondered how fibre optic networks actually make their way into the ground beneath our feet? Bringing fast, reliable connectivity to communities is more than just plugging in a cable, it is a carefully planned process involving civil works, protective conduit, and precise fibre installation. Different construction methods There is no ‘’one size fits all’’ […]
Monthly Archives: August 2025
UEA, our Horizontal Directional Drilling contractor has added a fresh spin to their daily toolbox meetings – hosting them each morning at the Salty Dog Café. The morning ritual of breakfast and daily prestart check-in has quickly become part of their routine, creating a space where the team can connect, share updates, and start the […]
The beach manhole has been delivered to Torquay for installation. Whilst the concrete box might not look like much, it’s an essential part of the project that provides safe, secure access for the SMAP cable to land on shore. It is designed to handle the harsh coastal environment of salt air, shifting sands, and ground […]
Horizontal Directional Drilling (HDD) works have been successfully completed at Voss Circuit, Torquay – a key moment in the infrastructure roll-out. Delivered by our experienced contractor UEA, the works were completed safely, efficiently, and with minimal disruption. Site demobilisation is currently underway and will continue over the coming weeks. We extend our sincere thanks […]
Adelaide fronthaul works have been successfully completed, another major milestone in the rollout of SMAP. Delivered by our trusted contractor, Mirait Technologies Australia, the installation included five manholes and associated conduit. This infrastructure forms part of the fronthaul pathway that directly links to the Adelaide CLS. The site was managed with appropriate traffic […]
On Friday, our team successfully completed the Pre-Lay Shore End (PLSE) landing for the SMAP cable in South Australia. A major milestone as the state’s first ever subsea cable comes ashore. Captured in this video, the PLSE operation involved carefully bringing the cable through HDD (horizontal directional drilling) works where it will then be connected […]