A Big Year for the SMAP Project – 2024 Progress Recap 

This year has been monumental for the SMAP Project. Let’s take a look back at the highlights!     The SMAP Blog officially launched in November 2023, documenting our progress and attracting almost 40,000 views since its inception.     March  Cable Manufacturing: Production began at ASN.  System Upgrade: The SMAP cable’s design was enhanced from 12 […]

Wavelength products – Part Three, OTN Client Services​

In addition to carrying ethernet services, OTN networks have their own interface standards allowing the carriage of OTN containers from other customers networks. When purchasing an “OTN” product from SUBCO, carriers can transparently run their own OTN networks across the top of the SUBCO network. SUBCO offers OTN services at OTU4 (100Gbps) or OTU2/2e(10Gbps) interface […]

Wavelength products – Part Two, Ethernet over OTN (EoOTN)​

While OTN discussed in our previous blog defines its own OTN Client interfaces, it also includes a standard on how it can be used to transport foreign client types such as Ethernet, SDH and Fibre Channel.    The most common type of client signal carried across SUBCO wavelengths are Ethernet services. SUBCO refers to Ethernet […]

An Intro to Wavelength Products – Part One

Until the turn of the 21st century, fibre optic networks typically carried only a single wavelength per fibre. The capacity of that wavelength was shared among multiple customers using Time-Division Multiplexing (TDM) technologies like Synchronous Digital Hierarchy (SDH). In TDM, a customer’s capacity is allocated dedicated ‘timeslots’ on the wavelength. For example, if a wavelength was 2.48Gbps […]

How are subsea cables made?

The SMAP cable system will have over 5200km of subsea cable across its trunk (Sydney to Perth) and branches (Melbourne and Adelaide).  We’ve looked briefly before at cables and repeaters, but since our manufacturing is approaching 100% completion, today we’re going to do a deep dive into how a submarine cable is made.    A […]

Watch: HDD Number 2 of 6 Completed in Maroubra

Following last week’s site meet-up with Google, SUBCO are thrilled to announce the successful completion of HDD #2! Our delivery partner UEA have been making great progress, the video below illustrates divers finalising HDD #1 in Maroubra. During this process, precise measurements were taken to confirm positioning, including:• The distance from the seabed floor to […]